Figure 6. Artist's rendering of the placement barge lowering one of the tube sections. The tubes remained filled with air, and were lowered by placing gravel ballast in special racks built into the tops of each tube section. The bulkheads were removed and reused after the ends were welded to the next adjoining segment.